Russia: The Ultimate Data Center Destination

Unlock Unprecedented ROI with Strategic Data Center Investments

Img (9)

Capitalize on Russia's unique advantage: the perfect combination of the world's lowest electricity rates, exceptionally affordable land, and robust infrastructure for data center development. While global markets struggle with skyrocketing energy costs, our locations offer unmatched operational savings of up to 40% compared to US, European and Asian alternatives.

Img (9)
Icon 1 32x52px

Land

Icon 2 32x52px

Electricity

Icon 3 32x52px

Wholesale Rate

Icon 4  32x52px

Transportation Access

Icon 5 32x52px

Fiber Optic Connectivity

Vector

Secure your competitive edge in the rapidly expanding data center market with our turnkey predevelopment solutions.

Contact us today for your confidential investment briefing

How Zapusk Group pre-development helps to identify the best locations for data-center investors

The Russian Data Center Advantage:

  • World's lowest electricity costs - starting at just $0.03 per kWh
  • Premium industrial land at a fraction of international prices
  • Advanced fiber optic networks with redundant connectivity
  • Established technological ecosystem with qualified

Selection and assessment of industrial land plots (locations) with transportation accessibility, minimal distance from power supply centers, with necessary electricity capacity at wholesale rates, and access to backbone fiber optic networks.

 

This also includes a complex of preparatory activities preceding the direct construction of high-tech facilities with increased energy consumption, development of technological connection options and obtaining technical specifications, legal verification of land plots, network relocation, and verification of the absence of unsolvable problems.

 

The goal of Zapusk Group is to provide a reliable technological and legal foundation for data center construction in accordance with its needs and technical requirements.

 

 

Key factors for successful implementation of your project

Icon

Proximity to electricity supply.

It is important that the selected land plot is as close as possible to the power supply center and power grid, to ensure uninterrupted operation and eliminate additional costs for technological connection and transmission tariffs.

icon-02

Low (wholesale) electricity tariff.

The difference between retail and wholesale rates is 25-40%, which for an energy-intensive data center translates into millions of rubles in savings annually.
Icon (1)

Availability of developed infrastructure and transportation accessibility.

The site should be equipped with convenient access roads, quality roads, engineering communications, and other necessary infrastructure elements.
Icon (1)

Absence of land use and zoning restrictions.

It is necessary to consider administrative and legal restrictions on the use of land plots for industrial purposes.
card-icon-07

Backbone fiber optics.

Laying optical lines over significant distances can cost tens of millions of rubles and take months of approvals. The ideal location assumes the presence of points of presence of several independent providers, ensuring physical redundancy of communication channels and a competitive environment for tariff optimization.
Icon (3)

Suitable engineering and geological conditions.

Soil characteristics, groundwater level, seismic activity, and other factors should be carefully studied and meet the requirements of an industrial building.
Icon (2)

Favorable environmental conditions and industrial safety.

The placement of an energy-intensive facility should take into account environmental regulations and minimize negative impacts on the environment and residential infrastructure.
Icon (3)

We have ready-verified locations!

Get more details from our expert

Pre-development – the foundation for making optimal strategic and investment decisions

During project implementation, there are numerous scenarios, each with its own advantages and disadvantages, timeframes and costs, as well as return on investment levels.

The earlier a detailed project analysis is conducted, the more implementation options become available to the investor!

How the pre-development works

Zapusk Group follows standard practices for conducting pre-development works to provide investors with reliable data to make informed decisions and plan projects. We take into account investor’s requirements, timeframes, financial capabilities, urgency and business development prospects.

Stage A

pre-development:

  • Developing technical specifications according to the Client's objectives
  • Selection of locations and land plots for facility construction, taking into account purpose, logistical accessibility, access roads, and elimination of possible encumbrances (network relocation, ecology, etc.)
  • Assessment of possibilities and timeframes for technological connection (electricity, gas, heat, water)
  • Urban planning analysis
  • Preparation of possible project implementation scenarios with analysis of their advantages and disadvantages
  • Providing a detailed report to the Client for selecting the optimal project implementation scenario

Stage B

pre-project works:

  • Support for land plot purchase (lease) transaction and cadastral works
  • Topographic survey and geology
  • Obtaining technical conditions for technological connection of electric power
  • Obtaining complete initial data for further design, technical and economic justification, and project implementation

Considering investing in a data center infrastracture? Learn more about Russia advantage!

Book a meeting with our expert to evaluate possible options for your projects!
Tablet

Bardakhchiev Petr, Project Manager

Img (13)
Img (11)

ZAPUSK GROUP
guaranteeing the success of your project

Text

accumulating expertise and developing a partner network in industrial development

150+

successful projects for well-known Russian brands

Text (1)

Projects implemented in 19 different business sectors, each with its own specifics

Text (2)

>27.5 billion rubles of funds saved for our clients and investors at the pre-development and pre-project work stages

349+

We offer our clients more than 349 federal, industry-specific and regional support programs and financing for industrial and infrastructure projects

arrow-down-left
  • TRANSPARENCY
  • PREDICTABILITY
  • MANAGEABILITY
mfes-blue
ZAPUSK GROUP  – 
WINNER OF "DIGITAL ENERGY" COMPETITION 2024
LogoMFES
ZAPUSK GROUP –
WINNER OF "DIGITAL ENERGY" COMPETITION 2022
Logo
ZAPUSK GROUP – MEMBER OF THE BLOCKCHAIN ASSOCIATION

ZAPUSK GROUP Achievements

We work with all key market stakeholders in the Russian Federation

These companies trust us
with their investment projects

marketplace
specialized developers
manufacturing companies
trading companies
warehouse and logistics complexes
data centers and mining
office and business centers
shopping complexes
industrial parks
land developers

Since 2010, the Zapusk Group team has experience implementing more than 150 projects for small and medium enterprises, as well as major federal brands, ensuring cost and time reduction, along with transparency, predictability, and manageability of the launch and implementation process.

Find out how to choose the most profitable location for a data center in Russia

Download the eBook

 

"The Investor's Guide: 6 Key Criteria for Selecting Prime Data Center Location in Russia"

pic

Looking for unprecedented ROI with Strategic Data Center Investments?

Book a meeting with our expert to explore the opportunities.